Monoblock Two-room Office
Two separate rooms divided by a central partition.
Footprint: 240 × 600 cm. External height, finishes and equipment are agreed in the project specification.
Con-3 floor plan

Factory fit-out and site positioning
The selected layout is reviewed for factory assembly. Agree the internal fit-out before production and prepare the site for unloading, positioning and service connections.
Transport planning uses the completed module dimensions. Confirm vehicle access, lifting arrangements and prepared supports before delivery.
Specify your building
- Insulation and finishes
- Agree wall, roof and floor insulation, interior finishes and exterior colours for the destination and intended use.
- Electrical and plumbing
- Confirm lighting, sockets, water supply, drainage and hot-water requirements for the selected plan.
- Site preparation
- Coordinate foundations or supports, unloading and external utility connections with the local team.
