Layout 1 — Single Room
Open-plan single room for office or accommodation use, with a central entrance door and two windows.

Request a QuoteEngineered and manufactured in Türkiye for international projects.
Modular · Prefab · Steel — from Türkiye to the world.
Explore the models
Prefab Turkey supplies flat-pack and monoblock containers, modular buildings, workforce camps and steel structures from Türkiye to international projects. Every unit is engineered around the destination, the intended use and the local assembly resources: the approved quotation, calculations and project drawings always define the final supply.
Built to your specification: whatever you require, we manufacture it — dimensions, layouts, insulation thicknesses, finishes, doors, windows and fittings are produced exactly to your requirements.

Clear early data. Project-specific final engineering. The typical values below support initial system comparison; member thicknesses, connections, insulation, loads, fire performance and service systems are verified for each project and destination.
A coordinated steel frame brings the roof, floor and modular connections together. Light-gauge steel profiles are manufactured from galvanised steel sheet on computer-controlled roll-forming lines, with pre-punched screw, bolt and service holes for accurate fit-up. Screw and bolt connections enable quick on-site assembly without welding.

Reference values for the standard unit. For other loading requirements the chassis can be designed to the relevant Eurocodes with a structural calculation report; share the project location and required design loads with your enquiry.
Connected flat-pack modules form larger site offices, workforce accommodation and shared facilities, in single-storey or stacked two- and three-storey arrangements. Reference connection details cover base anchoring (corner anchor brackets with M12 mechanical anchors), stacked corner and module connections (5.0 mm plates and brackets, M10 bolts), platform supports and roof lath arrangements. The connection schedule for your building is confirmed in the project drawings.
Before final design we confirm: destination and applicable building rules; wind, snow, seismic and temperature data; occupancy and room schedule; fire, accessibility and escape requirements; MEP loads and utility interfaces; transport route, lifting and site access.
Every project is delivered with a defined documentation pack, which can include the manufacturer's ISO 9001 certificate (where applicable to the quoted scope), declarations for applicable CE-marked components, structural calculations and fabrication drawings per project, material certificates to EN 10204 3.1 on request, and a packing list with component identification for every shipment. Where required by the project, documentation may be prepared around EN 1090-1/-2 EXC2 and ISO 3834-4 welding quality requirements; availability is confirmed in the commercial and technical offer.
Six standard layouts on the 2.40 × 6.00 m platform (external height approx. 2.60 m). Plans are schematic layout references; the final drawing, equipment and dimensions are agreed for your project. All layouts are supplied as knock-down flat-pack kits: floor and roof frames, corner posts, insulated wall panels, doors, windows and service items packed for destination assembly by a small crew, without welding. These are starting points only: we manufacture to your specification, so any layout, dimension or fitting you require can be produced.
Common specification (all layouts): S350GD galvanised light-gauge steel chassis (1.5 / 2 / 3 mm options), wall panels 40–100 mm EPS / PUR / PIR / mineral wool to order, insulated roof build-up 40–100 mm, 16–20 mm fibre-cement floor with PVC or laminate finish, insulated steel external door, PVC double-glazed windows, CE-marked electrical installation. Standard design loads: snow 75 kg/m², wind 50 kg/m², floor 200 kg/m².
Open-plan single room for office or accommodation use, with a central entrance door and two windows.

Two separate rooms of 300 cm each, every room with its own external door and window.

Two rooms sharing a central WC compartment and entrance lobby.

Single room with a WC and washbasin compartment at one end.

Two rooms with a central WC and a kitchenette area, for self-contained living units.

Single room with a full bathroom (WC, shower and washbasin) at one end.

Need a different arrangement? Layouts, door and window positions, insulation thicknesses and sanitaryware levels are configured per project. Send the room schedule, quantity and delivery location and we will structure the brief for technical review.
Guard huts for factory gates, construction sites and car-park entrances. Check the footprint against the available space, the door swing against the pedestrian route, and the windows against the approach the guard needs to see. Cabins are delivered assembled or flat-packed depending on route and quantity.
Specification: galvanised steel frame, insulated sandwich-panel walls and roof (thickness to order), insulated steel door, PVC or aluminium windows (fixed and sliding options), electrical installation with lighting. External height approx. 2.29 m; final dimensions, openings and service connections are confirmed on the approved drawing.

The smallest footprint for a gate with limited space


Narrow guard hut with the entrance on the short end and a window along the side


Square cabin with windows on two adjacent sides for views across a site entrance


The largest model, with a wide window facing the approach and a separate side entrance


Fourteen standard configurations for site welfare facilities, camps and events. Headcount, operating hours, user groups and cleaning routines determine the right mix; privacy, entrance positions and accessible-use requirements are reviewed before the number of units is fixed. Dimensions are nominal external dimensions; the final specification is confirmed on the approved drawing.
All cabins include lighting and ventilation; hot-water equipment, external water and wastewater systems and site connections are included when listed in the quotation. Sanitaryware is available in standard, mid-range and premium levels.
140 × 120 × 230 cm
WC, urinal, washbasin
110 × 120 × 230 cm
urinal, washbasin
110 × 120 × 230 cm
shower tray and mixer, lockable entrance
110 × 120 × 230 cm
WC, washbasin, mirror
240 × 120 × 230 cm
decorative exterior cladding
120 × 220 × 230 cm
two compartments, separate entrances
120 × 240 × 230 cm
two WCs, one urinal, two washbasins
120 × 220 × 230 cm
separate WC and shower compartments
120 × 300 × 230 cm
three compartments, separate entrances
240 × 300 × 230 cm
three shower compartments
240 × 300 × 230 cm
dedicated equipment space
120 × 400 × 230 cm
four compartments
120 × 400 × 230 cm
four compartments
220 × 220 × 230 cm
support rails, entrance ramp
Plan and elevation drawings for the most common configurations. Final dimensions, fixtures and connections are confirmed on the approved drawing for your project.
Flat-pack kits ship as compact floor and roof packages with separate panels and components. Because our flat-pack sets can be loaded vertically into the freight container, a full 2.40 m module width is achievable where horizontal loading would force a narrower unit.

Monoblock (factory-assembled) delivery is also available where route, lifting and programme make it preferable: units are dispatched substantially assembled, and destination work is limited to unloading, positioning, module joints and external connections.
Share the destination, approximate size, capacity and intended use. Our engineering team will structure the brief for technical review. Quotations confirm the selected materials, design criteria, documentation pack and supply scope before you commit.
info@prefabturkey.com www.prefabturkey.comExport coordination: Yalova, Türkiye
Values in this catalogue are indicative, not a construction specification. Member thicknesses, connections, insulation, loads, fire performance and service systems are verified for each project and destination; the approved quotation, calculations and project drawings define the final supply.